Filename |
Size |
Last Modified |
2011StudyResultsMap-042506.pdf |
3845.1 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Compare Contrast v1 042506.ppt |
81.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
DUKE-10605 Mar'06 Activity Log.pdf |
13.2 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Duke March '06 Invoice.pdf |
15.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Duke-NC Consolidated Activity Log.xls |
24.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
NC TEPC Status Rpt MAR 040206 FINAL.doc |
49.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Reliability Study Scope-042506.ppt |
152.4 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Status of 2011 SummerReliability Study-1.doc |
37.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Status of the PWG Efforts v3 042006 - af.ppt |
108.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Summary of Cost Allocation 04-24-06.doc |
92.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Transmission - OSC Meeting Highlights 033006_1.doc |
36.4 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Transmission - OSC Meeting Minutes 033006_1.doc |
40.4 kb |
Fri, 27 Aug 2010 16:05:00 GMT |
Transmission Cost Allocation Overview v3 042606.ppt |
226.0 kb |
Fri, 27 Aug 2010 16:05:00 GMT |