Filename |
Size |
Last Modified |
DukePECAssumptionsLongTermServicev0.pdf |
16.6 kb |
Fri, 27 Aug 2010 16:03:00 GMT |
NCTPC 2005Reliability Study Scope-111805.doc |
62.4 kb |
Fri, 27 Aug 2010 16:03:00 GMT |
NCTPC 2005Reliability Study Scope-Draft 120705 REDLINE.doc |
90.0 kb |
Fri, 27 Aug 2010 16:03:00 GMT |
NCTPC 2005Reliability Study Scope-Draft111805REDLINE.doc |
65.4 kb |
Fri, 27 Aug 2010 16:03:00 GMT |
NCTPC PROCESS 120805.doc |
92.0 kb |
Fri, 27 Aug 2010 16:03:00 GMT |
TAG 2006 Activity Schedule.doc |
29.4 kb |
Fri, 27 Aug 2010 16:04:00 GMT |
TAG_SCOPE_120705.doc |
32.0 kb |
Fri, 27 Aug 2010 16:04:00 GMT |
Transmission - Duke Power Greensboro Office Directions.doc |
25.4 kb |
Fri, 27 Aug 2010 16:04:00 GMT |
Transmission - OSC Meeting Highlights 100405_approved 110205 OSC Mtg.doc |
35.4 kb |
Fri, 27 Aug 2010 16:04:00 GMT |
Transmission - OSC Meeting Minutes 092105_highlights_OSC approved 110205.doc |
38.0 kb |
Fri, 27 Aug 2010 16:04:00 GMT |
Transmission__NCCTPP_document_101005r2_1 JKC comments101105_1 Duke.doc |
101.4 kb |
Fri, 27 Aug 2010 16:04:00 GMT |
dbg pgk fpg Transmission NC Collaborative Process Schedule clean draft 102005.doc |
63.0 kb |
Fri, 27 Aug 2010 16:03:00 GMT |
dbgrwp_CBS Duke revised_NCHS-compare-contrast-Rev0 clean1.pdf |
24.1 kb |
Fri, 27 Aug 2010 16:03:00 GMT |